摘要
为检验秦沈线综合试验段的工程质量,确保全线建成开通后运营速度达到160km·h-1及以上,在秦沈客运专线进行了三次综合试验。大量的试验数据表明在不同动车组以200km·h-1及以上的高速度运行下,线路、路基、道岔、桥梁等的动力性能完全符合安全评判标准,达到了设计要求。
In order to check the engineering quality of the comprehensive test section on QinhuangdaoShenyang dedicated passenger line and insure the operation of over 160 km·h-1 after the whole line is completed, three comprehensive tests were completed. Slews of test data indicate that with different multiple unit trainsets running at high speed of 200 km·h-1 or more, the dynamic performance of the track, roadbed, turnout, bridge live up to the safety standard and the design requirements.
出处
《中国铁道科学》
EI
CAS
CSCD
北大核心
2003年第5期137-144,共8页
China Railway Science
关键词
秦沈线
客运专线
综合试验
Qinhuangdao-Shenyang line
Dedicated passenger line
Comprehensive test