期刊文献+

浅析世界银行贷款对小浪底工程的影响

Brief analysis of the impact of World Bank loan on Xiaolangdi Multipurpose Project
在线阅读 下载PDF
导出
摘要 小浪底水利枢纽工程是治理开发黄河的关键性控制工程。由于工程部分投资利用世界银行贷款,故工程建设管理按照国际招标工程的管理模式进行。一方面,世界银行贷款的使用对小浪底工程建设管理的顺利实施起到了积极的推动作用;另一方面,世界银行贷款的使用也带来了一些棘手的问题。小浪底水利枢纽建设管理局在对这些问题的探索和处理过程中,积累了许多宝贵的经验,为国内其他工程,特别是国际工程的建设管理提供了很好的借鉴。 The Xiaolangdi Multipurpose Project is a key project in the harnessing and development of the Yellow River Because of the project partially financed by the World Bank, the project has been undertaken under the framework of international competitive bidding On the one hand, the loan from the World Bank has made contribution to the smooth execution of the project, on the other hand,the use of the loan has also brought some hot potatoes In dealing with the problems, we have learned a lot of valuable experience, which will provide good reference for other projects in China, particularly international projects
作者 司南
出处 《水力发电》 北大核心 2003年第9期59-61,共3页 Water Power
关键词 小浪底水利枢纽工程 水利建设 招标工程 世界银行 贷款 loan from the World Bank, positive role, negative impact,countermeasures, suggestions, Xiaolangdi Multipurpose Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部