摘要
用离散系统模拟方法用计算机对矿山装载、运输系统进行模拟。通过模型描述系统的结构并描述不同时刻系统的状态及其变化。
The paper describes that method of variance system analogue is adopted to simulate load and haulage system at mine Computerized model depicts the system construction, status of the system at differrent time and change of the system.purpose aims at looking for necessary haulage system for mine and other analogue method of variance system, then brings the system nature to light and analyses the system to realize and improve avalible haulage system,choose optimum scheme while making a decision to make the haulage system reasonable and perfect.
出处
《煤炭科学技术》
CAS
北大核心
1992年第7期25-29,22,共6页
Coal Science and Technology