期刊文献+

一类线性加工时间单机调度问题(英文) 被引量:10

Single Machine Scheduling with Linear Processing Times
在线阅读 下载PDF
导出
摘要 讨论一类线性加工时间单机调度问题 .在这类问题中 ,工件具有相同的基本加工时间 ,但每个工件的实际加工时间以其开工时间线性增长 .对满足无延迟工件条件下极小化提前惩罚和问题 ,满足最大完工时间限制条件下极小化资源消耗总量的问题和满足资源消耗总量限制条件下极小化最大完工时间的问题 ,分别给出了最优算法 . This paper considers the single machine scheduling problem. It is assumed that jobs have the same basic processing time, but the actual processing time of each job grows linearly with its starting time. Based on the analysis of the problem, optimal algorithms are presented for the problems to minimize the sum of earliness penalties subject to no tardy jobs, to minimize the total resource consumption with makespan constraints, and to minimize makespan with the total resource consumption constraints.
出处 《自动化学报》 EI CSCD 北大核心 2003年第5期703-708,共6页 Acta Automatica Sinica
基金 SupportedbyDoctorThesisFoundationofNortheasternUniversity(2 0 0 2 0 8)
关键词 单机调度问题 线性加工时间 最优算法 提前惩罚问题 Algorithms Constraint theory Enterprise resource planning Job analysis Optimization Scheduling Theorem proving
  • 相关文献

参考文献11

  • 1Alidaee B, Womer NK. Scheduling with time dependent processing times: Review and extensions. Journal of Operational Research Society, 1999,50(5): 711-720.
  • 2vGupta J N D, Gupta S K. Single facility scheduling with nonlinear processing times. Computers and Industrial Engineering, 1988, 14(4) 1387-393.
  • 3Mosheiov G. V-shaped policies for scheduling deteriorating jobs. Operations Research, 1991,39 (6) :979-991.
  • 4Mosheiov G. A-shaped policies for scheduling deteriorating jobs. Journal of Operational Research Society, 1996,47(6) :1184-1191.
  • 5Mosheiov G. Scheduling jobs under simple linear deterioration. Computers and Operations Research, 1994,21 (6) :653-659.
  • 6Baehman A, Janiak A. Minimizing maximum lateness under linear deterioration. European Journal of Operational Research, 2000,126(1) :557-566.
  • 7Cheng T C E, Ding Q. Single machine scheduling with deadlines and increasing rates of processing times. Acta Informatica.2000.36(5):673-692.
  • 8Chang S, Schneeberger H. Single machine scheduling to minimize weighted earliness subject to no tardy jobs. European Journal of Operational Research, 1988,34(2):221-230.
  • 9Qi Xiang-Tong, Tu Feng-Sheng. Scheduling a single machine to minimize earliness penalties subject to the SLK duedate determination method. European Journal of Operational Research, 1998,105(3) :502-508.
  • 10Cheng T C E, Janiak A. Resource optimal control in some single-machine scheduling problem. IEEE Transactions on Automatic Control, 1994,39(6) :1243-1246.

同被引文献83

  • 1赵传立,张庆灵,唐恒永.具有线性恶化加工时间的调度问题(英文)[J].自动化学报,2003,29(4):531-535. 被引量:17
  • 2赵传立,唐恒永.一类资源约束单机排序问题[J].系统工程学报,2004,19(5):451-456. 被引量:12
  • 3闫杨,赵传立.安装时间受资源约束的单机成组调度问题[J].电机与控制学报,2007,11(1):70-73. 被引量:5
  • 4闫杨,赵传立.一类安装时间受资源约束的单机成组排序问题[J].系统工程与电子技术,2007,29(6):938-941. 被引量:3
  • 5ALIDAEE B, WOMER N K. Scheduling with time dependent processing times: review and extensions[ J ].Journal of the Operational Research Society, 1999, 50(7) : 711-720.
  • 6CHENG T, DING Q, LIN B. A concise survey of scheduling with time-dependent processing times [ J ]. European Journal of Operational Research, 2004, 152( 1 ) : 1-13.
  • 7PINEDO M. Scheduling: theory, algorithms, and systems [ M ]. 2nd ed. New Jersey: Prentice Hall, 2002 : 27-49.
  • 8BACHMAN A, JANIAK A. Minimizing maximum lateness under linear deterioration[J]. European Journal of Operational Research, 2000, 126 (3) : 557- 566.
  • 9BACHMAN A, JANIAK A, KOVALYOV M Y. Minimizing the total weighted completion time of deteriorating jobs [ J]. Information Processing Letters, 2002, 81 ( 2 ) : 81-84.
  • 10WU C C, LEE W C, SHIAU Y R. Minimizing the total weighted completion time on a single machine under linear deterioration [J].The International Journal of Advanced Manufacturing Technology, 2007, 33 ( 11 ) : 1237-1243.

引证文献10

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部