阐述了杭州市四堡污水处理厂为解决排放口受钱塘江潮影响而建的排江泵房的调试经过 ,分析排放口潮水变化情况对污水处理厂出水的影响。
The effluent discharging of a wastewater treatment plant situated at the mouth of Qiantang River was frequently obstructed by the tidal fluctuation, so an output pumping station was constructed. In trial run of this pumping station, the dynamic tidal pattern at the outfall of wastewater was studied and a post tank water level based pump assembly control plan has been set down for this output pumping station.