摘要
萨中油田已进入高含水后期,已建设施及工艺出现了老化、不适应,同时运行能耗不断上升,给控制生产成本带来较大困难。大庆油田有限责任公司第一采油厂通过对已建生产系统调整改造的实践,取得了老油田高含水后期在系统调整、挖潜增效方面的一些启示,对控制油气生产成本,提高油田开发的经济效益有很好的借鉴作用。
Sazhong oilfield has entered the high watercut period,the existing facility and technology are of aged and no more suitable,the energy consumption rate is increasing,which caused trouble in production cost control. The First oil production Plant of Daqing Oilfield Co. Ltd. Practised the reconstruction and adjustment on the existing production system,obtained some experience in respect of system adjustment and creating potential effectiveness for the high watercut period of the old oilfield. This experience serves as a good reference to the oil gas production cost control and raising up of the economic effectiveness of the oilfield development.
出处
《石油规划设计》
2003年第4期1-3,共3页
Petroleum Planning & Engineering