摘要 通过岩石坚固性系数f=4~20的深立井井下现场试验,研究了硬岩深孔爆破的空气冲击波、上抛飞石和地震波在井筒内产生的原因及其对尚未达到设计强度的井壁混凝土与井内悬吊设施的严重危害,优化设计了深立井硬岩低抛掷深孔减冲爆破参数.在宣东二矿主井钻爆实践中曾连续4个月创月掘砌成井96 0,141 0,133 1和110 0m的高水平,井筒基岩段754m,平均掘砌成井速度达108 9m/月,建井速度是煤炭立井工期定额(23 7m/月)的4 6倍. Through spotexperiment in deep shaft with the rock solid coefficient of which is from 4 to 20,the author studied the reasons of forming of blasting wave and throwingup rocks and earthquakewave and the damage on equipments in the shaft and concrete which does not reach the final designing strength. The blasting parameters with lowthrown out and deep hole in hard rock of vertical shaft are optimized.With the new blasting method,highquality engineering records with 960,1410,1331 and 1100 m each month for successive four times have been set during the construction of main shaft of the Second Mine of Xuandong. The basement rock section of the main shaft is 754 m high,the average advance rate of the shaft reach 1089 m per month, which is 46 times as that of the term quota (237 m/month) for coal mine shaft.
作者 张馨
出处 《煤炭学报》 EI CAS CSCD 北大核心 2003年第4期403-408,共6页 Journal of China Coal Society
关键词 深立井 硬岩深孔钻爆 低抛掷减冲爆破 掘砌成井速度 deep vertical shaft drilling and blasting in hard rock blasting with low-thrown out and deep hole advance rate of shaft construction
  • 相关文献

参考文献3

二级参考文献12

共引文献20

同被引文献54

引证文献8

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部