摘要
本文根据目前光缆通常的埋设保护情况以及重型机械的性能指标,分析了计算重型机械设备在施工时对地埋式光缆的影响,并据此提出对应的保护方案。
According to the ordinary buried depth and protection methodology of cable, performance parameter of heavy-duty machinery, this paper tries to analyses and calculate the effect on buried cable under the scenario of heavy-duty machinery constructing. It provides propose for protection method at last.
出处
《电信工程技术与标准化》
2003年第7期51-55,共5页
Telecom Engineering Technics and Standardization