摘要
大亚湾核电站反应堆厂房37m跨全钢穹顶采用垂直解体法将穹顶分成两块吊装,既保证了安装质量,又加快了施工速度,取得了较好的经济效益。
The 37m span steel dome of Dayawan Nuclear Power Station Building was hoisted by vertically dividing into two halves. It obtained favourable economic benefits with good installation quality and fast construction speed.
出处
《建筑施工》
1992年第6期11-13,共3页
Building Construction