摘要
本文介绍了在更换京广上行线154号桥简支梁时接触网施工配合的方法。对今后类似的施工及事故抢修有可借鉴的经验。
The paper introduces the overhead contact line construction coordination during replacing simple-supported beam of No.154 bridge on up-line of Beijing-Guangzhou railway, supplying a referencing experience for similar construction and emergency repair in future.
出处
《电气化铁道》
2003年第3期22-24,共3页
Electric Railway