摘要
依据野外工程地质勘察资料,对米仓山改建路段的主要工程地质问题进行了讨论,对路堑越岭方案可行性进行分析论证;提出测设及施工中对各种不良地质现象应采取的防护措施.
In this paper,the author analyses and discusses the primary geologic Hazards of Micang Mountain segment, Jiangwu Road. And it discusses the fausibility of the road getting over the mountain. According to the characteristics of the different geologic, the preventive measures are put forward.
出处
《兰州铁道学院学报》
2003年第3期66-69,共4页
Journal of Lanzhou Railway University