摘要
结合深圳地铁十八标段喷锚构筑法暗挖隧道的防水施工与治水措施 ,分析了防水层与防水混凝土的实际作用 ,建议取消经实践验证防水效果差的防水板 ,将防水的措施集中到结构防水混凝土方面 ,达到改善防水效果。
Based on the waterproofing technique and water treatment measures adopted in the tunnel built by NATM in No.18 section of Shenzhen metro, the real effects of waterproof layer and waterproof concrete have been analyzed. To improve the waterproofing effect and satisfy the waterproof requirements, it is suggested that the waterproofing board of low efficiency should be abolished, and structural waterproofing concrete should be mainly used instead.
出处
《现代隧道技术》
EI
2003年第3期37-41,共5页
Modern Tunnelling Technology
关键词
地铁隧道
暗挖
渗漏水
喷锚构筑法
Metro tunnel
Mining
Leakage
Anchor and shotcrete