期刊文献+

孤南131断块油藏高含水后期剩余油挖潜 被引量:2

Development of the remaining oil in Gunan 131 fault-block reservoir in the later stage of high water cut
在线阅读 下载PDF
导出
摘要 为提高孤南 1 31断块油藏的采收率 ,在加强油藏精细研究、深化油藏认识、搞清剩余油分布规律的基础上 ,通过应用复合解堵工艺、水力割缝技术、完善注采井网、优化生产参数等进行调整挖潜 .经矿场实验后 ,水驱开发效果得到了明显改善 ,采收率由 2 4 .8%提高到 2 9.0 % . In order to increase the recovery factor of Gunan 131 fault block reservoir, some work, such as fine research of reservoir, understanding remaining oil distribution, is done. Based on these, some measures are introduced by which the potentiality of the remaining oil of the fault block reservoir is further tapped. They are combination plug removing technology, hydraulic cutting fracture technique, perfecting injection production pattern, optimizing production parameters etc. Field tests show that the measures obviously improve the result of water flooding, the recovery factor of the fault block reservoir is increased from 24.8% to 29.0%. The successful experience obtained from the development of the reservoir can be used for reference in the later development of similar reservoirs.
作者 孙晖 刘丽
出处 《西安石油学院学报(自然科学版)》 2003年第3期32-35,共4页 Journal of Xi'an Petroleum Institute(Natural Science Edition)
关键词 孤南131断块油藏 高含水后期 采收率 剩余油分布 后期开发 Gudao oilfield fault block reservoir remaining oil distribution later development
  • 相关文献

参考文献3

二级参考文献10

共引文献16

同被引文献18

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部