摘要
笔者从技术条件、经济条件、环保条件等方面 ,全面分析青藏线某标段制梁场有价值的 4个方案。经综合比选 ,确定了最佳方案 ,为高质量。
The author gives an all round analysis to the 4 valuable schemes of the prefabricated plant in a certain tendered section on the Qing-Zang line in the aspects of technical, economic and environmental conditions, and determines the optimal scheme through comprehensive comparisons, which lays a solid foundation for fulfilling the construction task in top quality and at low cost.
出处
《铁路工程造价管理》
2003年第3期15-19,共5页
Railway Engineering Cost Management