摘要 根据焦作煤业集团公司演马电厂的锅炉及原除尘系统的实际情况,选择新型高效的JZGD30Ⅲ/3电除尘器作为该厂锅炉烟气治理的收尘设备.系统设计中,通过阻力计算,合理选择了烟道形状和规格,并对原除尘系统风机后部不合理的烟道作了改进,保证引风机运行在合理的工况点上.该除尘系统于2002年5月通过焦作市环保局的验收,达到了既能实现达标排放又节约改造投资的目的. According to the practical conditions of Yanma Power Plant's boiler and its former dust?removing system,and on the basis of the spot?test,the new?style and high?effective of electrical dust remover JZGD30Ⅲ/3 has been chosen to use as the dust?collecting system for the boiler.During the design of the system,the style and form of the smoke?dust passage have been reasonably chosen according to the calculation of the resistance.then the rave part of the former fanner has been transformed to make it work best.The project has achieved the standard of discharge and saved the transformation funds,It has been checked and accepted by Jiaozuo Enviromental Protection Bureau in May,2002.
作者 邵守杰
出处 《焦作工学院学报》 2003年第2期125-128,共4页 Journal of Jiaozuo Institute of Technology(Natural Science)
关键词 煤矸石电厂 除尘系统 锅炉 电除尘器 烟气治理 阻力 烟道 系统设计 grangue power plants the dustremoving system system design
  • 相关文献

参考文献2

  • 1严兴忠.工业防尘手册[M].北京:劳动人事出版社,1989..
  • 2刘天齐.三废处理工程技术手册[M].北京:化学工业出版社,1998..

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部