分析了大庆市炼油厂催化裂化装置BQ4 3 / 640 - 8/ 2 6- 3 .82 / 4 5 0型余热锅炉存在的问题 ,并对这些问题进行了有针对性的技术改造 。
We analyzed the problem of Type BQ43/640-8/26-3.82/450 waste heat boiler in FCC unit of the refinery at Daqing Petrochemical Company and proceeded to carry out technical modifications aiming at the existing problems.The effect of stabilization and energy saving on the waste heat boiler was attained.
出处
《应用科技》
CAS
2003年第5期29-32,共4页