摘要
80年代末以来,中水头段大型混流式水轮机在我国应用非常广泛。但随着单机容量和机组尺寸的不断增大,机组刚度相对降低,水轮机运行稳定性问题也越来越突出。通过对大朝山水电站水轮机模型与现场测试。
Since the end of 1980s, the mixed flow turbines under middle heads range have been used widely in our country. The turbine stiffness decreases with the increase of its capacity and size, so engineers pay more attention to the turbine operation stiffness. The measurements for model test and field test on the turbine of the Dachaoshan Hydropower Station provide some experience for the research on turbine stability.
出处
《水力发电》
北大核心
2003年第4期50-52,共3页
Water Power
关键词
大朝山水电站
水轮机
模型试验
测试
turbine, model test, field test, stability, Dachaoshan Hydropower Station