7Watanabe T,Hashimoto Y,Nishikawa l,et al.Line balancing using a genetic model[J].Control Eng Practice, 1995,3( 1 ) :69-76.
8Ciobanu G.A branch-and-bound algorithm to solve an assembly line balancing problem[J].Economic Computation and Economic Cybernetics Studies and Research, 1977(4) : 69-79.
9Pang Chuan-Chen.An heuristic method for manufacturing assembly line balaneing[J].Western Eleerie Engineer, 1975,19(4) : 36-45.
10Bhattacharjee T K.An heuristic app roach to general assembly line balancing [J].International Journal of Operations & Production Management, 1988,8( 6 ) : 67-77.