电厂水源只要取自地表 ,不论是在海洋取水 ,还是在地表江河取水 ,取水口泥沙运动特性及冲淤变化分析都是首要问题 ,该问题研究对电厂今后安全运行至关重要。为了进一步掌握地表河流取水、取水口泥沙淤积问题 ,对已运行某电厂取水口淤积问题进行分析研究 ,可以对其它正在兴建工程起到借鉴作用 ,以便及早采取防治措施 。
This paper discusses the characteristics of the sediment transport processes and makes an analysis of sediment erosion,deposition of the intake for the thermal power plant,the study of the water for the intake either from surface water or from ocean is very important for the effective operation of the plant which is based on actual data of sediment erosion and deposition to the intake.Some protect measurement of sediment erosion and deposition to the intake could be adopted by the analysis of the study which is beneficial for safe and effective operation of the power plant.
出处
《电力勘测设计》
2003年第1期41-43,共3页
Electric Power Survey & Design
关键词
水电厂
取水口
淤积
防治
intake,sediment,erosion,deposition,measurement of protection.