摘要
青铜峡水库由于建库初期蓄水运行 ,库容快速淤损 ,后虽然改变了运用方式 ,库区仍缓慢淤积 ,现在只剩下5 %的库容。为了研究其冲淤规律 ,优化运行方式 ,建立了青铜峡水库泥沙冲淤计算数学模型 ,并对模型进行了验证 ,得到令人满意的验证结果。
In the primary period of Qingtongxia reservoir operated at high water level,it was deposited quickly. Though the operation way was changed after that, the reservoir was depositing slowly until now only 5% of capacity is left. The numerical model of sediment deposition in Qingtongxia reservoir was set up to study the deposition rule and optimize the operation way.The model was also verified and got satisfactory results.
出处
《水土保持研究》
CSCD
2003年第2期145-147,共3页
Research of Soil and Water Conservation