摘要
本文将间歇精馏过程看作是一个资源分配问题,应用动态规划方法以进行最优化,即在规定纯度的定量馏出物条件下,求使馏出时间最短的问题,从而消除了整体约束的难题.
The diseontinuous distillation process may be regarded as a sourses allocation problem, therefore, dynamic program method may be used to obtain the optimal distillation policy, i.e, under the condition of a defined quantity of distillate with defined final Concentration, the duration of distillation is minimized, thus the difficult problem of Solving global restriction is avoided.