摘要
通过浙江华讯通信科技大楼工程高强预应力混凝土管桩基础施工,说明了高强预应力混凝土管桩的优缺点,论述了确保其施工质量的行之有效的技术措施。
The high prestressed concrete tube-stake construction of Zhe Jiang Hua Xun communication scientific technology building indicates some advantages and disadvantages. The paper discusses some technological measures that can guarantee the construction quantity.
出处
《建筑管理现代化》
2003年第1期51-52,共2页
Construction Management Modernization
关键词
混凝土管桩
高强预应力混凝土
施工质量
对策
High prestressed concrete tube-stake, Carrying capacity of single stake, domino offect of squeezing soil