期刊文献+

解决弯道式引水枢纽弯道过宽的新措施 被引量:5

The New Measure to Solve the Wide Bend of Bend Style Water Diversion Structure
在线阅读 下载PDF
导出
摘要 通过新疆金沟河弯道式引水枢纽改建工程模型试验研究 ,提出了在弯道内增设中导流堤和溢流侧堰的工程措施 ,较好地解决了第一代弯道式引水枢纽弯道过宽而产生的泥沙淤积和引水等问题 。 Through the hydraulic model research of Xinjiang Jingou River bend style water diversion structure reconstruction works, this paper put forward engineering measure by setting up a middle diversion dike and overflow side weir in bend, so it is a good solution to solve the sediment deposition and water diversion problem which is result from wide bend of the first generation bend style water diversion structure.It has reference effect for modification and design of bend style water diversion structure.
出处 《新疆农业大学学报》 CAS 2001年第4期44-48,共5页 Journal of Xinjiang Agricultural University
关键词 弯道式引水枢纽 引水弯道 溢流侧堰 bend style water diversion structure water diversion bend overflow side weir
  • 相关文献

参考文献1

  • 1宋祖诏,张思俊,许杏陶.渠首工程.北京:水利电力出版社,1989.

同被引文献36

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部