摘要
简述了三姓浅滩概况及二期航道整治工程的效果 ;
This paper introduced the general situation of Sanxing river channel and the effect to harness works of the second stage channel.It also analyzed variation of the divided flow rate engineering from beginning to end.
出处
《黑龙江水专学报》
2000年第4期44-45,共2页
Journal of Heilongjiang Hydraulic Engineering College
关键词
航道
整治工程
分流比分析
疏浚
channel
harness works
divided flow rate analysis