期刊文献+

崖门大桥主梁牵索挂篮施工模拟计算 被引量:14

Simulation Calculation for Construction with Guyed Traveler for Main Girder of Yamen Bridge
在线阅读 下载PDF
导出
摘要 准确细致的施工过程仿真计算是大跨度混凝土斜拉桥施工监控的关键问题之一,它可以为大桥各阶段的施工监控提供理论依据。根据崖门大桥主梁施工工艺的特点,建立了牵索挂篮施工模拟计算的流程,并对牵索方案的选择以及主梁立模标高的确定等问题进行了探讨。在此基础上,给出了崖门大桥主梁的施工流程及其计算结果。 The correct and careful simulation calculation for construction process is one of the important concerns for construction control of longspan concrete cablestayed bridges and can provide theoretic bases for the construction control at various stages of the bridges. In this paper, according to the construction technique features of the main girder of Yamen Bridge, the process of construction with the guyed traveler is established and the issues regarding the selection of the guy construction schemes and determination of the elevation of the girder formwork are discussed, and the construction process and calculation results of Yamen Bridge are presented as well.
出处 《桥梁建设》 EI CSCD 北大核心 2003年第1期12-15,共4页 Bridge Construction
关键词 崖门大桥 主梁 模拟计算 斜拉桥 预应力混凝土结构 挂篮 桥梁架设 结构分析 桥梁施工 cable-stayed bridge prestressed concrete structure, traveler, bridge erection, structural analysis
  • 相关文献

参考文献1

二级参考文献6

  • 1陈德伟,郑信光,项海帆.混凝土斜拉桥的施工控制[J].土木工程学报,1993,26(1):1-11. 被引量:68
  • 2颜东煌 崔冰 等.铜陵长江公路大桥施工控制中的仿真计算.年中国公路学会桥梁学术大会论文集[M].北京:人民交通出版社,1995.347-355.
  • 3Tang M C,Civil Engineering ASCE,1998年,68卷,2期,42页
  • 4颜东煌,中国公路学会桥梁会议文集,1995年
  • 5Tang M C,Int Sympo Cable Stayed Bridges,1994年
  • 6陈德伟,土木工程学报,1993年,26卷,2期

共引文献7

同被引文献76

引证文献14

二级引证文献50

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部