长电缆-GIS系统的侵入波过电压 被引量:3

Incoming Lightning Overvoltages in Long Cable-GIS Systems
在线阅读 下载PDF
导出
摘要 采用三相-护层(外壳)-大地模型研究了110kV长电缆-GIS系统的侵入波过电压及绝缘配合。结果表明,对芯导体、护层(外壳)及大地之间联系紧密的长电缆-GIS系统,其耦合作用和大地影响不可忽视;电缆、GIS及主变的过电压水平随电缆长度增加而降低;过电压保护的关键在于限制电缆首端的过电压,电缆末端和GIS不需加装避雷器;可作为工程设计和制修订有关标准的参考依据。 Using the three phases-sheath (enclosure)-earth model, the incoming lightning overvoltages and insulation coordination in 110kV long cable-GIS systems are studied. The results show that the coupling effects and influence of earth can not be ignored; the longer length of cable, the lower overvoltage level in cable and GIS; it is crucial to limit the overvoltage of cable entrance, and the arresters installed at cable terminal and GIS are unnecessary. It can be regarded as reference for project design and revising the concerned standards.
出处 《高电压技术》 EI CAS CSCD 北大核心 1992年第2期14-18,共5页 High Voltage Engineering
关键词 长电缆 OIS 侵入波过电压 incoming lightning overvoltage insulation coordination long cable GIS
  • 相关文献

参考文献1

  • 1吴维韩.全封闭组合电器变电所的过电压保护和绝缘配合问题[J]高压电器,1984(01).

同被引文献1

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部