摘要
结合 2 0 0 0年 1 1月 2 8日及 30日 2 2 0 k V河临线故障掉闸情况 ,分析了两次掉闸原因及存在问题 。
Combined with the breakdowns of switch-off which happened in 220 kV HeLin line in 2000 11 28 and 11 30 The proper analyses,the cause and existed problems to puts new ways to solve the problems in view of the actual situation of transmission lines in YunCheng.
出处
《山西电力》
2002年第6期56-56,59,共2页
Shanxi Electric Power