摘要
静压预制桩常遇到压入困难和造成邻近房屋受影响。
Piling difficulty and damage to the adjacent buildings due to piling aften occur when static pressed piles are used. Based on the practical project, the treatment for common problems in static pressed piles during construction supervision is presented in this paper.
出处
《福建建设科技》
2002年第4期56-56,58,共2页
Fujian Construction Science & Technology