摘要
杭嘉湖南排工程是治理太湖十项骨干工程中的关键性工程 ,其四个出海口均设置于钱塘江强涌湖地段 ,尤以盐官下河站闸枢纽为规模最大 ,难度最高 .通过对盐官下河站闸枢纽口门模袋砼施工的经验总结 ,提出强涌潮地段实施模袋砼工程的具体措施 ,具有较大的应用价值 .
Irrigation Engineering of Hangzhou-jianxin-Huzhou Area is the Key one among the projects of Taihu Lake improvewent,for the outputs are all located along climax fide bore course.The article puts up with the measures of applying concrete bundlings in that couse after the example of Yanguan Xiahe Station.
出处
《浙江水利水电专科学校学报》
2002年第4期61-62,共2页
Journal of Zhejiang Water Conservancy and Hydropower College
关键词
强涌潮地段
模袋砼
施工措施
Climax tide bore,concrete bundlings,constructing measures