摘要
在城市道路改扩建中,降低对沿线高压走廊的影响是关键。文章以苏州某道路改扩建工程为例,剖析临高压线和高压塔段面临的问题。通过对慢行车道进行独立线形设计,优化路基路面方案,并通过计算验证,道路运营荷载下高压塔基础沉降符合要求,提出的技术方案与防护措施,可为同类工程提供有效参考。
In the reconstruction and expansion of urban roads,reducing the impact on the adjacent high-voltage corridors along the line is a key issue.Taking a road reconstruction and expansion project in Suzhou as an example,this paper analyzes the problems faced in the sections adjacent to high-voltage lines and high-voltage towers.Through independent alignment design for slow traffic lanes and optimization of subgrade and pavement schemes,calculation verification shows that the settlement of high-voltage tower foundations under road operation loads meets the requirements.The proposed technical schemes and protective measures can provide effective references for similar projects.
出处
《时代汽车》
2026年第4期163-165,共3页
Auto Time
关键词
改扩建道路
高压走廊
主要问题
Reconstructed and Expanded Roads
High-Voltage Corridors
Main Problems