中国电网交流励磁变速抽水蓄能机组首次建设与运行

The First-time Construction and Operation of AC-excited Variable-speed Pumped Storage Units in China's Power Grid
在线阅读 下载PDF
导出
摘要 丰宁抽水蓄能电站顺应我国能源结构发展要求,首次应用和建设了两台交流励磁变速机组,且首次全面经历了可行性研究、招标文件编制、主机合同谈判和执行、现场安装和试验直至运行的全过程。以该工程为研究对象,对变速机组建设必要性、系统设计、设备设计和制造、安装过程中的部分关键技术进行了概要介绍,并特别针对变速机组在中国电网中运行的相关数据展开分析,通过工程实践验证了变速机组的性能优势,可为未来变速机组的设计、制造、安装、试验和运行提供参考和借鉴。 Fengning Pumped Storage Power Station is the first time in China to apply and construct two AC-excited variable-speed generating units,and is also the first time to go through the entire process from feasibility study,tender document preparation,main equipment contract negotiation and execution,on-site installation and testing to operation.This paper briefly introduces the construction necessity,system design,equipment design and manufacturing,and some key technologies during the installation process of the variable-speed units.It particularly analyzes the relevant data of variable-speed unit operating in Chinese power grid.Through engineering practice,the performance advantages of variable-speed units have been verified,which can provide reference and guidance for the design,manufacturing,installation,testing and operation of variable-speed units in the future.
作者 吴培枝 王英伟 穆良 杨梅 张昊晟 王建明 王纯 付晓娣 WU Peizhi;WANG Yingwei;MU Liang;YANG Mei;ZHANG Haosheng;WANG Jianming;WANG Chun;FU Xiaodi(State Grid Xinyuan Group Co.,Ltd.,Beijing 100024,China;State Grid Xinyuan Hebei Fengning Pumped Storage Co.,Ltd.,Chengde 068350,Hebei,China;PowerChina Beijing Engineering Corporation Limited,Beijing 100024,China)
出处 《水力发电》 2026年第4期73-83,共11页 Water Power
基金 国网新源集团有限公司科技项目资助(SGXYKJ-2019-074)。
关键词 首次 抽水蓄能电站 交流励磁变速机组 设计制造 安装 运行 first time pumped-storage power station AC-excited variable-speed unit design and manufacture installation operation
  • 相关文献

参考文献6

二级参考文献69

共引文献62

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部