摘要
随着城乡规划逐步从增量扩张进入存量优化时代,土地资源日趋紧张,对既有基坑改造利用已成为趋势。鉴于此,文章以上海南干线改造工程40号顶管工作坑为例,总结小平面大深度基坑加深改造的设计经验,分析上海地区该类基坑加深改造需要解决的核心问题,为类似工程建设提供借鉴。
As urban and rural planning gradually shifts from incremental expansion to stock optimization era,land resources are becoming increasingly tight,making the renovation and utilization of existing foundation pits a trend.In view of this,taking No.40 Pipe Jacking Working Shaft of the Shanghai South Trunk Line Reconstruction Project as an example,this paper summarizes design experiences for deepening renovation of small-area large-depth foundation pits,analyzes core problems that need to be solved in such pit deepening renovations in the Shanghai region,and provides references for similar engineering constructions.
作者
高武
GAO Wu(Shanghai Municipal Engineering Design InstituteCo.,Ltd.,Shanghai 200092,China)
出处
《中国市政工程》
2026年第1期92-96,101,139,140,共8页
China Municipal Engineering
关键词
土地资源紧张
基坑改造
小平面大深度基坑
顶管法
污水干管
tight land resources
foundation pit renovation
small-area large-depth foundation pit
pipe jacking method
sewage trunk pipe