在抽水蓄能电站快速落地、拟建电站单位造价逐渐上升的新形势下,本文基于国内已建和在建的抽水蓄能电站施工费用,分析抽水蓄能电站建筑工程中投资占比较大的施工项目,指出各电站施工费用的差异主要是由于主要材料价格和市场竞争激烈程度的影响。
Under the new circumstances where pumped storage power stations are rapidly being established and the unit cost of proposed power stations is gradually increasing,this paper,based on the construction costs of domestic pumped storage power stations that have been built or are under construction,explores the construction projects that account for a large proportion of investment in pumped storage power station construction engineering.It points out that the differences in construction costs among various power stations are mainly due to the influence of main material prices and the intensity of market competition.
作者
张宇翔
胡悦妍
崔淞皓
ZHANG Yuxiang;HU Yueyan;CUI Songhao(PowerChina HuaDong Engineering Co.,Ltd,Hangzhou 311100,China)
出处
《建筑经济》
2025年第S2期93-95,共3页
Construction Economy
关键词
抽水蓄能电站
工程管理
成本控制
施工费用
pumped storage power station
project management
cost control
construction costs