摘要
结合甘肃省中西部地区水资源匮乏,人民生产生活用水困难等问题,为缓解甘肃省缺水地区的水资源供需矛盾,在引洮一期供水工程的基础上,通过引水规模计算、总、干渠运行方式比较、供水流量确定的基础上,进行供水方案比较,合理分析研究了引洮二期供水工程的引水、供水规模、供水方案。
There are problems such as water scarcity and difficulties in obtaining water for people's production and daily life in the central and western regions of Gansu Province.In order to alleviate the water supply and demand contradiction in water scarce areas of Gansu Province,based on the first phase of the Tao River Diversion Project,this paper compares the water supply schemes through the calculation of diversion scale,comparison of total and main canal operation modes,and determination of water supply flow rate.It reasonably analyzed and studied the water diversion,water supply scale,and water supply plan of the second phase of the Tao River water supply project.
作者
沈若寰
SHEN Ruohuan(Gansu Water Investment Group Co.,Ltd,Yintao Water Supply Company,Lanzhou 743000,China)
出处
《云南水力发电》
2026年第1期22-26,共5页
Yunnan Water Power
关键词
供水
引水
引洮工程
供水规模
供水方案
water supply
diversion
Tao river diversion project
water supply scale
water supply plan