摘要
本文重点分析了大庄支线受水区水资源现状及输水系统存在的问题,论述了大庄支线建成后输水系统的运行方式及工程效益。详细介绍了环北部湾广西水资源配置工程大庄支线输水系统的设计方案。同时,结合大庄支线现状,提出调度管理的策略及建议,为后期工程运行管理提供思路。
An analysis was made on the current status of water resources and the existing problems of water conveyance system in the water receiving areas of Dazhuang branch,one of the components of Guangxi Water Resources Allocation Project Around Beibu Gulf,based on which the authors demonstrate the operation mode of water conveyance system and the engineering benefits of Dazhuang branch after it is constructed,and present in detail the design scheme of water conveyance system.Combined with the current situation of Dazhuang branch,countermeasures and suggestions are put forward for dispatching management,providing ideas for future operation management of the project.
作者
施先敏
刘鹏
刘时明
SHI Xian-min;LIU Peng;LIU Shi-ming(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2025年第6期69-71,95,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
输水系统
大庄支线
设计方案
工程调度管理
water conveyance system
Dazhuang branch
design scheme
dispatching management of project 95