摘要
本文以环北部湾广西水资源配置工程为例,系统梳理了勘测定界技术流程,构建了“多源数据融合-空间分析-精准外业-智能量算-规范编制-三级质检-重难点管控”的全链条技术体系。重点剖析了主要技术难点及解决措施,为类似大型线性基础设施项目的勘测定界工作提供技术参考。
Taking Guangxi Water Resources Allocation Project Around Beibu Gulf as example,the technical process of survey and demarcation was systematically sorted out;a full-chain technical system was established,covering"multi-source data fusion-spatial analysis-precise fieldwork-intelligent measurement calculation-standard compilation-three-level quality inspection-control of key and difficult points".The main technical difficulties and solutions were analyzed in detail.
作者
郭碧华
张波
GUO Bi-hua;ZHANG Bo(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2025年第6期24-27,46,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
线性水利工程
勘测定界
土地权属
建设用地
环北部湾广西水资源配置工程
linear water conservancy project
survey and demarcation
land ownership
land for construction use
Guangxi Water Resources Allocation Project Around Beibu Gulf