摘要
随着经济社会的全面绿色转型以及“双碳”目标的推进实施,海上风电项目的开发建设势头日渐强劲,并逐渐在全球能源结构转型中得到广泛应用。本文以欧洲某海上风电导管架的建设项目为背景,具体介绍了风电导管架卡桩器调试流程,讨论了海上风电项目与海洋油气项目间卡桩器调试流程的差异,相关测试设备和材料,以及操作注意事项等,为类似的海上风机工程提供有益的参考和借鉴。
With the comprehensive green transformation of economic and social development and the pursuit of China's“dual carbon”targets,offshore wind power project development is gaining momentum and playing an increasingly important role and finding wide application in the global energy transition.Taking a European offshore wind power jacket foundation project as an example,this paper presents the commissioning process of the jacket pile gripper,highlights the differences in gripper commissioning between offshore wind and offshore oil and gas projects,describes the associated test equipment and materials,and summarizes key operational precautions,thus providing a useful reference for similar offshore wind developments.
作者
毕航铭
BI Hangming(COOEC-Fluor Heavy Industries Co.,Ltd.,Zhuhai 519050,Guangdong,China)
出处
《海洋工程装备与技术》
2025年第4期44-48,共5页
Ocean Engineering Equipment and Technology
基金
中国海洋石油集团有限公司“300米水深级导管架设计及建造关键技术研究”(CNOOC-KJ 135 GJJS 28 GC 2020-01)。
关键词
海上风电
卡桩器
调试流程
液压软管
offshore wind power
gripper
commissioning process
hydraulic hose