摘要
天然气长输管道项目是与人民生活息息相关、关乎人民福祉的重大民生工程,但由于在施工过程中沿途穿越山区、沟壑、深丘、河流等多种复杂地形,给施工过程造成阻碍与困难,尤为突出的是山地陡坡地段施工过程中遇到的瓶颈,更是对施工技术人员一项大的挑战与考验。以冀东油田神木气田佳县区块南区产能建设地面工程为例,探索研究山地陡坡段施工过程中的方法与技巧,为施工技术人员提供一定参考,以保障长输管道建设的顺利推进。
The long-distance natural gas pipeline project is a major public welfare project closely related to people's lives and wellbeing.However,due to the fact that the construction process involves crossing various complex terrains such as mountains,gullies,deep hills and rivers along the way,it has created obstacles and difficulties for the construction process.What is particularly outstanding is the bottleneck encountered in the construction process of steep mountainous slope,which is also a great challenge and test for construction technicians.Taking the ground engineering of production capacity construction in the southern area of Jiaxian Block in Shenmu Gas Field of Jidong Oilfield as an example,this paper explored and studied the methods and techniques in the construction process of steep slope section in mountainous area.It provides some reference for construction technicians and ensures the smooth progress of long-distance pipeline construction.
作者
吴江涛
WU Jiangtao(Sichuan Petroleum and Natural Gas Construction Engineering Co.,Ltd.,Chengdu,Sichuan 610000,China)
出处
《石油工业技术监督》
2025年第12期63-67,共5页
Technology Supervision in Petroleum Industry
关键词
天然气
长输管道
山地陡坡
施工技巧
natural gas
long-distance pipelines
mountain steep slope
construction techniques