摘要
某新建铁路工程项目主墩基础施工面临深水、裸岩、高水头差(近30m)及紧邻既有高速公路等严峻挑战。经研究分析,需采用非爆破开挖施工工艺,该工艺存在效率低、成本高、风险大等诸多技术难题。本文以该工程为背景,系统研究深水裸岩工况下的施工一体化设计方案。
The foundation construction of the main pier for a newly built railway project faces severe challenges including deep water,exposed bedrock,a significant water head difference(nearly 30m),and proximity to an existing expressway.Research analysis indicates the necessity of adopting non-explosive excavation techniques,which present numerous technical difficulties such as low efficiency,high costs,and significant risks.Against the backdrop of this project,this paper systematically investigates an integrated construction design solution for deep water and exposed bedrock conditions.
作者
林李彬
LIN Li-bin(China Railway 25th Bureau Group First Engineering Co.,Ltd.,Guangzhou 510030,China)
出处
《价值工程》
2025年第34期117-119,共3页
Value Engineering
关键词
斜拉桥
深水裸岩基础
基坑开挖
封底混凝土
cable-stayed bridge
deep-water bedrock foundation
excavation of foundation pits
bottom-sealing concrete