摘要
文章主要阐述了商丘五金装备产业园建设项目区采取表土剥离及回覆、雨水排水工程、乔灌草结合绿化、透水砖工程、植草砖等典型工程措施、植物措施及临时措施,这些措施在满足主体工程需求的同时,也满足了水土保持的要求。
This paper mainly elaborates on the typical engineering measures,plant measures and temporary measures adopted in the construction area of Shangqiu Hardware Equipment Industrial Park,such as topsoil stripping and restoration,rainwater drainage engineering,combined greening of trees,shrubs and grass,permeable brick engineering and grass brick engineering.These measures not only meet the requirements of the main project,but also fulfill the requirements of soil and water conservation.
作者
郑永科
ZHENG Yongke(Henan Cuijie Engineering Management Co.,Ltd.,Xinyang 464000,China)
出处
《河南水利与南水北调》
2025年第9期7-8,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
产业园区
水土保持
水土流失
水保措施
industrial park area
water and soil conservation
soil erosion
soil and water conservation measures