外置双核心筒间多道转换桁架混合结构施工关键技术研究

Key Construction Technique Study on Multi-level Transfer Trusses Between Outer Dual Core Shafts
在线阅读 下载PDF
导出
摘要 以上海临港某办公塔楼工程为对象,开展了外置双核心筒间多道转换桁架混合结构施工关键技术研究,涉及基于数值模拟计算的外置双核心筒间多道转换桁架混合结构整体施工流程设计、转换桁架钢板“日”字形复杂截面焊接技术、转换桁架节点铰接变刚接转换技术。通过以上技术的应用,解决了塔楼结构施工工序复杂,桁架复杂截面焊接残余应力大,转换桁架节点在施工过程中弯矩大、难以释放等问题,同时,借助实时监测技术,有效保证了转换桁架多次加载、卸载下的施工安全。 Taking a high-rise office tower in Lianken,Shanghai as the object,key construction techniques for multi-level transfer trusses between outer dual core shafts are studied.The research includes overall construction process design of multi-level transfer trusses between dual core shafts based on numerical simulations,welding techniques for complex shaped steel sections of transfer trusses,and conversion techniques from pinned joints to rigid joints in truss nodes.Through the application of these techniques,complex construction sequences,large residual welding stresses from complex sections,and high bending moments in transfer truss joints during construction are addressed.With the implementation of real-time monitoring,construction safety is effectively ensured under multiple loading and unloading cycles.
作者 严斌 金伟峰 武诣霖 YAN Bin;JIN Weifeng;WU Yilin(Shanghai Mechanical Construction Group Co.,Ltd.,Shanghai 200072,China;Shanghai Engineering Research Center of Oriented in Typical Building Application Robot,Shanghai 200072,China)
出处 《建筑施工》 2025年第10期1579-1584,共6页 Building Construction
基金 上海建工集团股份有限公司基金项目(23JCSF-30)。
关键词 外置双核心筒 转换桁架 复杂截面 铰接变刚接 实时监测技术 outer dual core shaft transfer truss complex section pin-to-rigid joint conversion real-time monitoring technique
  • 相关文献

参考文献16

二级参考文献53

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部