摘要
以珠江三角洲水资源配置工程取水泵站——鲤鱼洲泵房为研究对象,基于ANSYS有限元数值分析软件,建立几何模型及材料模型,对泵房结构进行有限元数值分析计算,研究厂房结构在静力、动力状态下的应力位移特性,评估泵站厂房结构形式设计的合理性,可为同类型厂房结构的动力设计优化提供参考。
Taking Liyuzhou pump house,the water intake pump station of the Pearl River Delta Water Resources Allocation Project,as the research object,based on the ANSYS finite element numerical analysis software,the geometric model and material model are established,the pump house structure is analyzed and calculated by finite element numerical method,the stress displacement characteristics of the powerhouse structure under static and dynamic conditions are studied,the rationality of the structural design of the pump station powerhouse is evaluated,and the reference is provided for the dynamic design optimization of the powerhouse structure of the same type.
作者
孙文涛
SUN Wentao(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510635,China)
出处
《广东水利水电》
2025年第9期54-58,64,共6页
Guangdong Water Resources and Hydropower
关键词
泵站厂房
结构设计
共振校核
动响应分析
pump station building
structural design
resonance check
dynamic response analysis