过火后桥梁损伤病害及加固效果分析

Bridge Damage Diseases and Reinforcement Effect Analysis After Fire
在线阅读 下载PDF
导出
摘要 为分析混凝土桥梁火灾后损伤病害并制定加固对策,以辽宁省某过火桥梁为例,经现场检测数据分析,建立了有限元数值模型。通过截面折减和预应力折减,模拟了过火后桥梁损伤现状,结果表明过火后桥梁承载能力降低,不满足相关设计规范要求。针对损伤病害制定了具体的加固方案,增加临时支撑以保证通车。采用T梁混凝土破坏部分环氧砂浆修复、T梁腹板和底板粘贴钢板补强、横隔板联系加强等措施,模拟加固后的状态。计算结果表明,加固后结构满足相关承载能力和应力验算要求。 In order to analyze the damage diseases of the concrete bridge after fire and formulate the reinforcement measures,taking a burnt bridge in Liaoning province as an example,the finite element numerical model is established based on the on-site inspection data analysis.Through the cross section reduction and prestress reduction,the damage status of the bridge after fire is simulated.The result shows that the bearing capacity of the bridge decreases after fire,which can not meet the requirement of relevant design specification.The specific reinforcement scheme is formulated for the damage diseases,and temporary supports are added to ensure smooth traffic.The measures such as repairing the damaged part of T-beam concrete with epoxy mortar,reinforcing the T-beam web and bottom plate with steel plates,and strengthening the connection between diaphragms are adopted,so as to simulate the status after reinforcement.The calculation results show that,the structure after reinforcement can meet the requirements of relevant bearing capacity and checking calculation of stress.
作者 左新黛 姬伟 Zuo Xindai;Ji Wei(Research Institute of Highway Ministry of Transport,Beijing 100088,China;Beijing Rail Transit Construction Management Co.,Ltd.,Beijing 100037,China)
出处 《北方交通》 2025年第8期19-23,共5页 Northern Communications
关键词 混凝土桥梁 火灾 损伤病害 有限元模拟 加固效果 Concrete bridge Fire Damage diseases Finite element simulation Reinforcement effect
  • 相关文献

参考文献2

二级参考文献18

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部