垣曲抽水蓄能电站输水上平段施工支洞结构设计

Structural Design of Construction Adit for the Upper Tunnel of the Water Conveyance System of Yuanqu Pumped Storage Power Station
在线阅读 下载PDF
导出
摘要 介绍垣曲抽水蓄能电站上平段输水隧洞施工支洞的地质条件、总体布置、结构设计、设计优化以及施工调整情况,总结施工支洞设计经验,并根据设计与实际地质条件及施工情况等变化,提出设计及施工建议,可供类似工程参考。 This paper introduces the geological conditions,overall layout,structural design,design optimization and construction adjustment of the construction adits of upper tunnel of the water conveyance system of Yuanqu Pumped Storage Power Station.It summarizes the design experience of the construction adit and proposes design and construction suggestions based on changes in design and actual geological conditions and construction conditions,which can be referenced for similar projects.
作者 刘畅 臧玉燚 LIU Chang;ZANG Yuyi(ChinaWater Northeastern Investigation Design and Research Corporation Limited,Changchun 130021,China)
出处 《水电与抽水蓄能》 2025年第4期116-120,共5页 Hydropower and Pumped Storage
关键词 垣曲抽水蓄能 施工支洞 结构设计 设计优化 Yuanqu pumped storage power station construction adit structural design design optimization
  • 相关文献

参考文献13

二级参考文献52

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部