摘要 [目的]以海上风电与海洋牧场融合发展科研综合实验平台海上安装施工为研究对象,[方法]采用有限元数值模拟软件,开展上部模块吊点设计及吊装技术研究。[结果]结果表明,针对上部模块设计8吊点双撑杆组合吊索的吊装方式,与常规框架式吊梁相比更节约材料,更方便施工,[结论]可安全完成上部模块的吊装,降低吊装风险。 [Purpose]Taking the integrated development of offshore wind power and ocean ranching as the research object,[Method]the installation and construction of a scientific research comprehensive experimental platform on the sea,finite element numerical simulation software is used to carry out the design of upper module lifting points and research on lifting technology.[Result]The results indicate that the lifting method of designing an 8-point double brace combination suspension cable for the upper module is more material efficient and convenient for construction compared to conventional frame type lifting beams.[Conclusion]The hoisting of the upper module can be completed safely and the hoisting risk can be reduced.
作者 冯金杰 区振棠 马进 刘子聃 刘臻 FENG Jinjie;OU Zhentang;MA Jin;LIU Zidan;LIU Zhen(Guangzhou Salvage,Guangzhou 510290,China;China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510670,China)
出处 《船舶工程》 北大核心 2025年第S1期1-5,共5页 Ship Engineering
关键词 风电 海洋牧场 上部模块 吊耳 吊装 wind power ocean ranch upper module hanging ear lifting and hoisting
  • 相关文献

参考文献4

二级参考文献5

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部