为提高堤防加固工程水土流失防治工作的针对性,对典型工程新增水土流失量进行了预测分析,识别了水土流失发生的位置、时段和危害程度。预测结果及分析对于工程水土流失防治措施的制定和设计具有指导意义。在后续施工过程中,采取针对性工程、植物和临时措施,可有效减少水土流失的发生。施工期结束后进入自然恢复期,应做好各项水保措施的运维工作,更好地发挥减少水土流失功能,减轻对周边环境的影响;加强沿河两岸绿化区域的观测和养护,使林草植被尽快恢复,发挥固土作用。
In order to improve the pertinence of the prevention and control of soil and water loss in the embankment reinforcement project,this paper predicts and analyzes the new amount of soil and water loss in typical projects,and identifies the location,time period and harm degree of soil and water loss.The prediction results and analysis have guiding significance for the formulation and design of soil and water loss control measures.In the subsequent construction process,targeted engineering,vegetation and temporary measures can effectively reduce the occurrence of water and soil loss.After the end of the construction period,the natural recovery period will be entered.The operation and maintenance of various water and soil conservation measures should be done well to better play the function of reducing water and soil loss and reduce the impact on the surrounding environment.At the same time,it is also necessary to strengthen the observation and maintenance of the green areas along both banks of the river,so as to restore the forest and grass vegetation as soon as possible and play the role of soil consolidation.
作者
王兴顺
张喜
程阳
朱贻鸣
蔡安巧
WANG Xingshun;ZHANG Xi;CHENG Yang;ZHU Yiming;CAI Anqiao(HONGYU Engineering Co.,Ltd.,Changzhou 213000,China;Changzhou Hydrology and Water Resources Survey Bureau of Jiangsu Province,Changzhou 213002,China)
出处
《云南水力发电》
2025年第8期121-123,共3页
Yunnan Water Power
关键词
堤防加固
水土流失
土壤侵蚀模数
预测分析
embankment reinforcement
soil erosion
soil erosion modulus
forecast analysis