摘要
导流隧洞下闸封堵是水库蓄水前的关键步骤,对水库后期的稳定运行具有重要意义。通过结合阿岗水库的工程特点,进行了导流隧洞的封堵设计及施工设计,为水库下闸蓄水奠定了基础。
The closure of the diversion tunnel is a key step before the impoundment of the reservoir,which is of great significance for the stable operation of the reservoir in the later stage.Based on the engineering characteristics of agang reservoir,the plugging design and construction design of diversion tunnel are carried out,which lays the foundation for the reservoir to be impounded.
作者
高志东
GAO Zhidong(Yunnan Institute of Water&Hydropower Engineering Investigation,Design and Research Co.,Ltd,Kunming 650000,China)
出处
《云南水力发电》
2025年第8期83-85,共3页
Yunnan Water Power
关键词
导流隧洞封堵
封堵体
抗滑稳定计算
堵头施工
diversion tunnel plugging
plugging body
anti-sliding stability calculation
plug construction