摘要
随着城镇化建设的不断提升,对城市的防洪排涝标准要求不断提升,许多老旧排涝区的防洪能力欠缺,对排涝泵站建设规划方案与施工技术也提出了更高要求。以北村泵站新建中型排涝站为背景,基于其主要建筑物的规划建设整体布置,对其围堰工程、泵房基坑支护与土方开挖及泵房主要结构进行了施工技术的研究,并制定了建设施工方案。
With the continuous improvement of urbanization construction,the requirements for urban flood control and drainage standards are rising.The flood control capacity of many old drainage areas is insufficient,and higher requirements are put forward for the construction planning scheme and construction technology of drainage pump station.Taking the newly-built medium-sized drainage station of Beicun pumping station as the background,and based on the overall layout of the planning and construction of its main buildings,this paper studies the construction technology of its cofferdam project,pump house foundation pit support and earth excavation,as well as the main structure of the pump house,and formulates the construction scheme.
作者
钟耀明
ZHONG Yaoming(Guangdong Province Foshan Nanhai District Dali Town Huangqi North Village sluice water conservancy station,Foshan 528231,China)
出处
《云南水力发电》
2025年第8期79-82,共4页
Yunnan Water Power
关键词
防洪排涝
围堰
泵站
施工技术
flood control and drainage
cofferdam
pump station
construction technology