某电站进场公路桥桥梁荷载试验检测方案

Load Test and Detection Scheme of a Power Station Access Road Bridge
在线阅读 下载PDF
导出
摘要 某水电站进厂公路线路跨鲁羌沟泥石流排导槽,设1座30 m预应力混凝土T梁桥。桥面高程为1325 m左右,桥宽10 m。由于大桥的跨径较大,设计、施工技术难度较大,为了减少不必要的加固、维修费用,确保交通基础设施的安全性能,现对桥梁结构物工作状态进行梁荷载试验检测。某水电站进场公路桥梁检测工作取得了满意的数据,做出了准确的评估,精确有效地评估桥梁的实际承载能力,具有社会经济价值。 A 30 m prestressed concrete T-beam bridge is set across the debris flow drainage channel of Luqiang gully on the access road of a hydropower station.The bridge deck elevation is about 1325 m and the bridge width is 10 m.Due to the large span of the bridge,the design and construction technology are difficult.In order to reduce unnecessary reinforcement and maintenance costs and ensure the safety performance of traffic infrastructure,the beam load test is carried out for the working state of the bridge structure.The inspection work of the bridge on the access road of a hydropower station has obtained satisfactory data and made an accurate evaluation.It can accurately and effectively evaluate the actual bearing capacity of the bridge,which has social and economic value.
作者 曹云娟 CAO Yunjuan(Yunnan Dianzhong Water DiversionPhase IIProject Co.,Ltd.,Kunming 650051,China)
出处 《云南水力发电》 2025年第8期28-30,共3页 Yunnan Water Power
关键词 进场公路 桥梁 荷载 试验检测 access road bridge load test detection
  • 相关文献

参考文献5

二级参考文献18

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部