期刊文献+

电力工程中变电站施工技术应用研究

Research on the application of substation construction technology in power engineering
在线阅读 下载PDF
导出
摘要 为了提升变电站施工的管理效率和质量,文章对变电站施工中存在的问题及技术优化方法展开了研究。传统的施工管理方法依赖二维图纸和文字描述,信息传递不畅,易导致施工误差和延误。为了解决这些问题,文章提出基于三维模型的施工协同管理方法,通过整合地理信息、工程信息和设计图纸,构建精确的三维模型,从而优化施工过程。研究表明,三维模型的应用显著提高了施工效率和质量,减少了约15%的返工率,节省了约10%的施工费用。 In order to improve the management efficiency and quality of substation construction,this paper studies the existing problems and technical optimization methods in substation construction.The traditional construction management method relies on twodimensional drawings and text descriptions,and the information transmission is not smooth,which easily leads to construct ion errors and delays.In order to solve these problems,this paper proposes a construction collaborative management method based on 3D model.By integrating geographic information,engineering information and design drawings,an accurate 3D model is constructed to optimize the construction process.Studies have shown that the application of 3D models has significantly improved the construction efficiency and quality,reduced the rework rate by about 15%,and saved about 10%of the construction costs.
作者 李法胜 刘泽元 潘富志 LI Fasheng;LIU Zeyuan;PAN Fuzhi(Shandong New Jiyuan Power Technology Co.,Ltd.,Jinan 250000,China;Shandong Guosheng Electric Power Engineering Co.,Ltd.,Jinan 250000,China;Desenkerod(Shandong)Power Technology Co.,Ltd.,Jinan 250000,China)
出处 《中国高新科技》 2025年第14期80-82,共3页
关键词 电力工程 变电站 三维模型 施工效率 electric power engineering Substation 3D model construction efficiency
  • 相关文献

参考文献5

二级参考文献15

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部